Raymond mill is a complete heavy-duty powder grinding equipment,consisting of main machine,grinding roller,grinding ring,fan,classifier,reducer,motor,pipelines and dust removal accessories.It contains a large number of metal components.Precision bearings and transmission parts are prone to rust under damp conditions and deformation under long-term compression,while electrical components are susceptible to erosion by moisture and dust.To keep new machines intact during warehouse storage and idle equipment during long-term shutdown,avoid jamming of rusted parts,circuit short circuits and failure of elastic components,and standardize the whole storage process of complete machines and spare parts,this specification is formulated.All warehouse and equipment custodians must implement it strictly.
Raymond mill shall be stored in an enclosed indoor warehouse with ambient temperature controlled at 0~35°C and relative humidity≤60%.Dehumidifiers shall be turned on in rainy seasons and humid weather to prevent ground moisture backflow and wall condensation.Open-air storage is strictly prohibited;exposure to sunlight and rain will cause paint peeling,rust of shaft parts and short circuits of damp motor windings.
The warehouse shall maintain continuous natural or mechanical ventilation,and ground dust shall be cleaned regularly.Dust entering grinding chambers,bearings and motors will lead to mechanical jamming and decreased insulation performance.All doors and windows of the warehouse shall be well sealed without rain leakage or seepage.
The ground shall be hardened and flat with moisture-proof wooden or steel pallets provided;equipment must not be placed directly on the ground.The warehouse shall be kept away from water sources such as steam pipelines,sprinkler systems and water pools,and separated from strong acids,strong alkalis and chemical powders with a clearance of no less than 3 meters.
Dry powder fire extinguishers shall be equipped in the warehouse.Open flames,welding work and smoking are totally forbidden.Lubricating oil and anti-rust grease shall be stored separately far from heat sources with complete fire isolation measures.
Loosen the pressure springs of grinding rollers to fully release mechanical stress.Lift the grinding roller assembly manually to completely separate grinding rollers from grinding rings,so as to avoid concave contact surfaces and fatigue failure of elastic parts caused by long-term compression.
Repair positions with damaged machine paint by applying anti-rust primer and topcoat to prevent steel plate perforation caused by rust.
Drain all old lubricating grease from reducers and bearing housings,then fill with brand-new high-temperature lithium-based lubricating grease to 60%of bearing cavity volume,preventing grease oxidation,caking and oil circuit blockage.
Seal and wrap the feed inlet,discharge outlet,fan air outlets and access doors with thick plastic film plus waterproof adhesive tape to stop moisture and dust from entering the machine interior.
Place the complete machine on load-bearing pallets with a ground clearance of over 10 cm and wall clearance of no less than 50 cm on all sides.Reserve access passages for inspection and ventilation around for regular patrol checks.
Split components of complete sets including main machines,fans and pipelines shall be placed in a single layer;multi-layer stacking and heavy compression are forbidden.Large main machines shall be stored in separate zones,while small pipelines and fittings shall be sorted and stored on shelves to avoid extrusion deformation.
Store new machines,idle standby equipment and equipment to be repaired in separate zones with material cards hung up,marked with model,warehousing date,storage duration and anti-rust maintenance cycle.Classify spare parts such as grinding rollers,grinding rings,bearings and motors with tags,and implement the FIFO(First In,First Out)principle.
Cover all equipment externally with thick rainproof and dust-proof tarpaulins or wrap with stretch plastic film.Fit a separate waterproof and dust-proof cover on the electric control cabinet,and place packed desiccants inside the cabinet for moisture prevention.
Sort and bind wires and cables,and wrap joints with waterproof insulating tape to avoid oxidation of metal connectors.
Tools and fasteners:pack into sealed boxes with a thin coat of anti-rust oil,and inspect rust conditions regularly.
④Record warehouse temperature and humidity,and clean accumulated dust around the equipment.
Unpack partial sealing covers to check for dampness and rust inside chambers;touch up peeled paint on the machine body;inspect springs and rubber seals for aging and deformation.
Under standard indoor dry sealed storage conditions,the maximum storage period of the complete machine is 12 months.Before commissioning equipment stored over 12 months,conduct full disassembly and re-inspection,fully replace all lubricating grease and remove rust layers.The machine can only be started after passing inspection.
Storing flammable thinners,gasoline and similar materials in the warehouse without isolation,which may contact equipment paint and rubber parts,is forbidden.

With 20 years of production experience, Shandong Huihe Environmental Protection Co., Ltd. of China specializes in calcium hydroxide production line and calcium hydroxide equipment. Our quality is reliable, welcome to consult.